In the first stage, the demolition of the old docks and the construction of a new low dock and three new marinas are carried out.
In a second stage, a multipurpose dock will be built against the end of the breakwater, in the farthest part of the coast, for ships up to 100 meters in length.
The works include energy services, drinking water, fire protection, Wi-Fi, lighting of the entire port, defenses, buoys, etc.
MTOP-DNH