Project Description:
160 m long reinforced and prestressed concrete exchanger with 3 well differentiated units.
First unit: 3 9m sections with prefabricated prestressed tiles and reinforced concrete slabs.
Second unit: 3 sections of 35m with post-tensioned longitudinal beams and reinforced concrete slabs.
Third unit: the same as the first with a curved layout defined by the planimetric inclination of the porticos.
Technical information:
Combination beam bridge Slab bridge.