330 ml spring 30 wide.
Foundation: Piles.
Superstructure: Precasting of transverse, longitudinal and pre-slab beams and concrete in situ.
Dredging.
Esplanade: approximately 30,000 m2 generated by filling with refulated and vibrocopacted material.
Pedraplén, sheet piles and precast walls, as containment of the fill of the esplanade.
Protective castling.
Services: electrical, lighting, sanitary, rainwater.
Substation.
Extension of the La Paz Spillway.