Project Description:
The Bulk Terminal project consists of the construction of 12 metal silos with a total capacity of 120,000 tons for the collection and shipment of bulk. This terminal has the distinction of being the first in the country to have silos elevated above ground level.
The terminal will allow grains to be exported by loading onto vessels directly from the silos via conveyor belts. There will be 3 dumping platforms to receive grain and the vessels will be supplied through two belts simultaneously, thus reaching a maximum loading capacity of 2,400 tons/h.
Construction Director: Gabriel Winkins
Resident Engineer: Fernando Radio
Construction foreman: Robinson Tomey.
Work term: 15 months