Project Description:
civil works
Key facts:
• Superficie total: 25.000m2
• Maximum height: 40mt
• Concrete volume: 28,000m3
• Hierro: 3,000 tons
• Fill: 70,000 m3
• Floors: 25,000m2
• Topping: 13,200 (concrete in tiles)
• Execution of block walls: 5,000 m2
• Buried HDPE pipes: 4,000 meters.mechanical assembly
Key facts:
• Total installed equipment: 2,140
• Mechanical assembly: + 10,000 tons
• Man hours: + 400,000Obras eléctricas y de I&C
Key data electrical works:
• Total installed equipment: 2,140
• Meters of cable installed: 392 km
• Connections: + 80,000
• Variators: 30 Units
• Man hours: 99,315
Datos clave I&C:
• Hook Up: 4.544
• Man hours: 76,504